I work at a big 3-letter multinational corporation, and we still compile and deploy manually. No continuous integration or, at least, automated testing. No build tool whatsoever, or a repo to store artifacts. Everything is compiled on the dev's workstation and sent by email.
We do have a disaster recovery server, but it sits outdated for weeks after a deployment in production. When something goes wrong, the switch is not automatic and transparent to the user, we have to email EVERYONE in the user's list to please use the DR server's address. There is no router or load balancer.
Crazy.
We do have a disaster recovery server, but it sits outdated for weeks after a deployment in production. When something goes wrong, the switch is not automatic and transparent to the user, we have to email EVERYONE in the user's list to please use the DR server's address. There is no router or load balancer.
Crazy.
I had the pleasure of working on a three node blue-green system at a Fortune 100 company (yes, enterprise can do some things right). Each cluster could be in either of two production modes or a staging mode, all switched with a simple command line request. The request created touchfiles that managed the load balancer behavior. Instantaneous switching, yeah!
On the other hand, the database was more or less a cache. It was very much availability over consistency, in CAP terms. If we had to keep transactional data, it would have been harder.
edit: When I started there and they described the architecture to me, I said "Cool, you're doing blue green deployment!", and the response was "What's blue green deployment?"
On the other hand, the database was more or less a cache. It was very much availability over consistency, in CAP terms. If we had to keep transactional data, it would have been harder.
edit: When I started there and they described the architecture to me, I said "Cool, you're doing blue green deployment!", and the response was "What's blue green deployment?"
BlueGreen deployments are easy to achieve using something like AWS ElasticBeanstalk (and they also force you to have your entire env setup in code so its quickly duplicatable for each deploy) with how easy it is to create a new stack and its 'Swap CNAME' feature.
However, now that Elastic Beanstalk supports incremental rollouts I don't see as much value in the approach.
We use Blue/Green deployments (with AWS EB) at Mi9 to deploy all our high traffic websites
However, now that Elastic Beanstalk supports incremental rollouts I don't see as much value in the approach.
We use Blue/Green deployments (with AWS EB) at Mi9 to deploy all our high traffic websites
Same here, we went to blue/green deploys when magic in Beanstalk broke and created an outage (we used to use beanstalk deploys where it does all the switching for you).
It is very sad and unfortunate that Amazon decided to limit the smaller number of instances to 1 in VPCs. In the old classic AWS you could set the minimum number of instances to 0, which allowed you to completely shutdown an environment without destroying it, effectively allowing you to turn back to it in a few seconds.
It is very sad and unfortunate that Amazon decided to limit the smaller number of instances to 1 in VPCs. In the old classic AWS you could set the minimum number of instances to 0, which allowed you to completely shutdown an environment without destroying it, effectively allowing you to turn back to it in a few seconds.
Database is the sticky part of this strategy.
If Blue is in production and Green is on deck, how are updates to the Blue database pushed to Green?
If Blue is in production and Green is on deck, how are updates to the Blue database pushed to Green?
I believe (in practice if not theory) it is common to handle db schema updates separately and to run both systems off the same database. This way the data only lives in one location but you get to run two slightly different app servers/frontends on top of it. You are then more careful with database changes. This sounds like a pain in the arse but a lot of people seem to be able to run with it without it causing a lot of additional overhead having to schedule your db changes to go out before your dependant code changes.
Yeah this is how you do it. You can also use feature toggles to help manage this. http://martinfowler.com/bliki/FeatureToggle.html
Yep agree, also keep the database schema a little soft - i.e. tolerant of minor changes.
( an example for SQL databases of this is having an 'additional info' field/table which has no value for indexing but contains additional captured info.)
( an example for SQL databases of this is having an 'additional info' field/table which has no value for indexing but contains additional captured info.)
So does this effectively mean - only create tables and add columns in your db schema migrations (no updating and removing)?
You can remove but you update the application to not read from the removed column (and test this in a test environment) first. "Updating" is best done by adding a new column, writing to the new column in parallel, back-populating it, reading from the new column, and then dropping the old column. It's a bit cumbersome but it works and it's safe.
Copy DB from live [blue] to staging [green], then run migrations and test. Do this several times. This should give you confidence that the migrations behave as intended before you flip from blue to green for production & run the migrations for real. If you have "big data" you can use schemaless migrations, for example never rename a column, instead add a new column, update the app to deal with both columns, then in a subsequent update remove the old column. You can also avoid migrations [use mongo instead of relational DB, for example]. I recommend Fowler's "DB Refactoring" book for further reading. http://martinfowler.com/books/refactoringDatabases.html
[deleted]
Personally I keep the database out of the equation, ala 12 Factor.
The database when treated as a unique exception allows you to just get on with developing robust infrastructure.
However for this to work you need to keep code off the database and treat database changes as migrations not blue/green deploys.
I can't say this enough, treat the database as an exception, keep it clean without code on it and with 'soft' schemas (ones that tolerate minor changes well) - then you can do b/g deploys easily.
Also let someone else host the DB where possible (or the same cloud infrastructure of course), it's just not worth the pain.
The database when treated as a unique exception allows you to just get on with developing robust infrastructure.
However for this to work you need to keep code off the database and treat database changes as migrations not blue/green deploys.
I can't say this enough, treat the database as an exception, keep it clean without code on it and with 'soft' schemas (ones that tolerate minor changes well) - then you can do b/g deploys easily.
Also let someone else host the DB where possible (or the same cloud infrastructure of course), it's just not worth the pain.
Yes. Especially if you're using one of the systems as a failover or you're running them as a normally active-active configuration. You want DB replication, but you also want to be able to take down a blue or green, apply DB updates, be able to independently access blue or green to check out your changes, then roll the world over the upgrade leg, then do the same work on the other side, check it out, and then make it available.
Alternating on blue / green as the 'live' side works, too.
Alternating on blue / green as the 'live' side works, too.
It's complicated and time consuming, but one way to do it is to never modify a column, add new ones and use trigger to copy values from one to the next. Only delete two deploys later.
I'm not saying I have a better solution, but that seems overly complicated and manual (e.g. remembering that in two deploys we're deleting ColumnA and TriggerColAColB) for a system that is seemingly designed to help automate the deployment process.
The idea reminds me of double-buffering. I wonder if there are other parallels that can be drawn (pun not intended) from the similarities
This is exactly double buffering, and I think it would be better to call it that than "blue/green deployment", because "blue" and "green" suggest that there is some difference between the two environments, that the question whether current "production" is "blue" or "green" matters, whereas this seems to be just two environments and a pointer that switches between them.
Betterment just posted an interesting set of slides from their #AnsibleFest presentation yesterday on 'Cyan' deployments powered by Ansible; kind of an evolution of the traditional 'Blue/Green' style described in Fowler's post: http://www.slideshare.net/AlanNorton1/cyansible
The way I do it is to rsync my code to a path such as "app-v1.0.0"
I then create symlinks such as "live" & "beta":
"live" -> "app-v1.0.0"
I rsync the code from a CI server or local host, after running bower/composer & testing, this way I deploy a "snapshot" of the entire codebase.
I find a lot of people just casually deploy their code with git, and subsequently run "bower install", tolerating downtime in between, with no solid rollback mechanism in place. I hear Capistrano works in a similar way but is git based instead of rsync. To me its really important that the updates happen atomically & roll back atomically, and as a result of running a single command.
Simple example of a "deploy.sh" I would use in a new project:
gulp production && rsync --update-after --delay-updates --exclude-from="rsync_exclude.txt" -avr ./ server-www:/var/www/html/
I then create symlinks such as "live" & "beta":
"live" -> "app-v1.0.0"
I rsync the code from a CI server or local host, after running bower/composer & testing, this way I deploy a "snapshot" of the entire codebase.
I find a lot of people just casually deploy their code with git, and subsequently run "bower install", tolerating downtime in between, with no solid rollback mechanism in place. I hear Capistrano works in a similar way but is git based instead of rsync. To me its really important that the updates happen atomically & roll back atomically, and as a result of running a single command.
Simple example of a "deploy.sh" I would use in a new project:
gulp production && rsync --update-after --delay-updates --exclude-from="rsync_exclude.txt" -avr ./ server-www:/var/www/html/
Netflix does it with two auto scaling groups: http://techblog.netflix.com/2013/08/deploying-netflix-api.ht...
This can be implemented easy using Ansible
http://docs.ansible.com/guide_rolling_upgrade.html
btw article is 4 years old
btw article is 4 years old
This actually doesn't describe a green/blue environment - it describes having a single environment that has code deployed in a rolling fashion. Which is useful, but not this use case.
It's also worth noting that this use case is actually pretty hard to model in ansible without external tools or the like. You basically need to deploy four jobs:
- deploy new code to inactive environment
- switch persona from inactive to active
- reconfigure load balancer to send to newly active
- switch formerly active persona to inactive
within some or all of those individual tasks you might want to apply these rolling techniques. But since rollouts may not be idempotent and this process isn't transactional, you have to be very careful indeed to code this out.
It's also worth noting that this use case is actually pretty hard to model in ansible without external tools or the like. You basically need to deploy four jobs:
- deploy new code to inactive environment
- switch persona from inactive to active
- reconfigure load balancer to send to newly active
- switch formerly active persona to inactive
within some or all of those individual tasks you might want to apply these rolling techniques. But since rollouts may not be idempotent and this process isn't transactional, you have to be very careful indeed to code this out.
Great link, I was actually reading that article just the other day, as I am looking into replacing puppet with ansible.
? 5-years-old
We use this at the (very large) corp that I work at, with very large, complex, high-traffic/revenue sites. Each component in the architecture has it's own "light/dark" deployment (in each environment), so any piece can be staged/tested/deployed/rolled-back with zero downtime. It has worked fairly well, with the majority of hiccups occuring during the ramp-up on the process.
We've used this technique at Respondly for the past year and a half with a Meteor stack. It's saved a lot of headaches and has greatly minimized downtime. It does have some gotcha's though when pushing certain types of changes. Mostly things around message formatting changes in shared queueing systems.
(looking for comments)
after reading that articles (some months ago) I've decided to implement that in our company , we're mostly using symfony2 and postgresql, and I came up with that https://github.com/allan-simon/ansible-docker-symfony2-vagra...
basically I have
so basically for the database problem I solve by telling our dev to be aware of it, which translate into a two step process for database upgrade. (we use Dotrine's ORM with doctrine migrations for migrations, so when i talk about getter /setters I talk about the entities' )
after I have to admit that fortunately 99% of our deployment are not about database changes so this "need to do it carefully" only happen once in a while and it does not affect our productivity (especially with the gain of being able to do CI)
last thing, is that I've used this technique only on small to medium websites, nothing with HUGE traffic, so I don't know if it's 100% no downtime, my test (running several `while true; curl WEBSITE ; done ` ) shown no traffic lost.
I just wanted to say that to get opinion from more experienced people, while telling to "normal company" fellows that it's possible to achieve that without "the cloud" and old-school server hosted in a DC or at customer's office.
Edit: of course we still have a dev and staging environment on which we validate code before deploying in production.
after reading that articles (some months ago) I've decided to implement that in our company , we're mostly using symfony2 and postgresql, and I came up with that https://github.com/allan-simon/ansible-docker-symfony2-vagra...
basically I have
______nginx__phpfpm+code (blue)
/ \
front nginx database
\______nginx__phpfpm+code/ (green)
The front nginx play the role of "switch" between blue and green , and the database is sharedso basically for the database problem I solve by telling our dev to be aware of it, which translate into a two step process for database upgrade. (we use Dotrine's ORM with doctrine migrations for migrations, so when i talk about getter /setters I talk about the entities' )
* if we add a column which must be "not null" , we add it with a default value first , so the few second the old code is still online , but the database is already updated , if an insert happen it will not fail . Then second time we drop that default value and put in the migration the SQL statement that handle previous data.
* if we drop a column, we first commit a version of our application which remove the code using this column , or make them return default value. and then the second deployement drop the column, so that the version N-1 is already made to not care about it.
etc. the base logic is "the database version N+1 should still work with version N of the code" , I like to image that with a "crossing a small river by always keeping a feet on earth rather than jumping the two feet at once "after I have to admit that fortunately 99% of our deployment are not about database changes so this "need to do it carefully" only happen once in a while and it does not affect our productivity (especially with the gain of being able to do CI)
last thing, is that I've used this technique only on small to medium websites, nothing with HUGE traffic, so I don't know if it's 100% no downtime, my test (running several `while true; curl WEBSITE ; done ` ) shown no traffic lost.
I just wanted to say that to get opinion from more experienced people, while telling to "normal company" fellows that it's possible to achieve that without "the cloud" and old-school server hosted in a DC or at customer's office.
Edit: of course we still have a dev and staging environment on which we validate code before deploying in production.
Yeah, that's the way to do it. Provided nginx is working properly it should be zero downtime.
That's from 5 years ago.
Also: Your database changes should be entirely backwards compatible and should happen in one location (not on its own slice).
Also: Your database changes should be entirely backwards compatible and should happen in one location (not on its own slice).
What's a good tool to automate the router configuration to point to the new deployment?
http://continuousdelivery.com/wp-content/uploads/2014/02/01_...